The Fire Danger Period for the Macedon Ranges Shire started at 1am on Monday 9 January 2023. Burning off is not allowed during this time. You can dispose of green waste for free at transfer stations.
Find out more
In This Section
The Engineering Requirements for Infrastructure Construction Policy sets out our requirements for engineering design and the construction of subdivision and other development works within the Macedon Ranges Shire. The policy provides guidance and aims to ensure the quality of new public assets, the compatibility of private works with Council's infrastructure, and the protection of the environment from the impacts of development.
Construction and Engineering Plans should include our standard notes(DOC, 130KB) / standard notes(PDF, 64KB).
Standard drawings are provided to assist in the design of a number of structures.